Resumen oficial · English
¿Qué se contrata?
The Contractor undertakes to design and perform a full charging infrastructure system com-patible with the battery-powered rolling stock described in Contract appendix 1, Requirements Specification. The Contract includes a complete power supply infrastructure and overhead contact line sys-tem, to be able to perform dynamic and static charging for battery trains: Hårlev Station • Overhead contact line system covering the three main tracks at the station • 50/25KV transformer solution to ensure power to the overhead contact line system • Detailed design • 400V power to train maintenance systems and heating and cleaning • Safety and interoperability approval • All necessary cable works on the station including cable trays • Immunization of the station signaling systems • Low voltage: Replacem
Traducción automática orientativa. El resumen oficial sigue siendo la referencia.
Resumen oficial · English
The Contractor undertakes to design and perform a full charging infrastructure system com-patible with the battery-powered rolling stock described in Contract appendix 1, Requirements Specification. The Contract includes a complete power supply infrastructure and overhead contact line sys-tem, to be able to perform dynamic and static charging for battery trains: Hårlev Station • Overhead contact line system covering the three main tracks at the station • 50/25KV transformer solution to ensure power to the overhead contact line system • Detailed design • 400V power to train maintenance systems and heating and cleaning • Safety and interoperability approval • All necessary cable works on the station including cable trays • Immunization of the station signaling systems • Low voltage: Replacem
Historial del anuncio
Cronología del procedimiento de contratación
Sigue las principales etapas y actualizaciones vinculadas a este procedimiento de contratación.
Todavía no se ha identificado ningún otro anuncio relacionado.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.
Fuente y fiabilidad
TED · 548575-2026. Verificado el 24 ago. 2026 15:05.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.