Sintesi ufficiale · English
Che cosa viene acquistato?
The Contractor undertakes to design and perform a full charging infrastructure system com-patible with the battery-powered rolling stock described in Contract appendix 1, Requirements Specification. The Contract includes a complete power supply infrastructure and overhead contact line sys-tem, to be able to perform dynamic and static charging for battery trains: Hårlev Station • Overhead contact line system covering the three main tracks at the station • 50/25KV transformer solution to ensure power to the overhead contact line system • Detailed design • 400V power to train maintenance systems and heating and cleaning • Safety and interoperability approval • All necessary cable works on the station including cable trays • Immunization of the station signaling systems • Low voltage: Replacem
Traduzione automatica indicativa. Il riepilogo ufficiale resta il riferimento.
Sintesi ufficiale · English
The Contractor undertakes to design and perform a full charging infrastructure system com-patible with the battery-powered rolling stock described in Contract appendix 1, Requirements Specification. The Contract includes a complete power supply infrastructure and overhead contact line sys-tem, to be able to perform dynamic and static charging for battery trains: Hårlev Station • Overhead contact line system covering the three main tracks at the station • 50/25KV transformer solution to ensure power to the overhead contact line system • Detailed design • 400V power to train maintenance systems and heating and cleaning • Safety and interoperability approval • All necessary cable works on the station including cable trays • Immunization of the station signaling systems • Low voltage: Replacem
Cronologia dell’avviso
Cronologia della procedura di appalto
Segui le fasi principali e gli aggiornamenti relativi a questa procedura di appalto.
Non è stato ancora individuato nessun altro avviso correlato.
I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.
Fonte e affidabilità
TED · 548575-2026. Verificato il 24 ago 2026, 15:05.
I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.