Official summary
What is being procured?
The Oslo Port of Oslo (HAV) has received a pledge of support from Enova to an onshore power plant for ccs ships at Kneppeskjær east. The facility must meet the requirements in the grant letter from Enova. This includes i.a. the requirements in NEK IEC PAS 80005-3. The procurement is for the procurement of land power installations. In addition the procurement includes the following options: 1. Cost reduction - Land supply system for CCS ships only. 2. Cable tower to CCS 3. Convert 4. Advanced cable management system, quay front 5. Back-up cables 6. Extended service contract The contractual terms for the delivery shall be in accordance with the standard contract terms for Oslo municipality ́s procurement of goods. The land power plant shall supply the ship at Kneppeskjær quay on Sjursøya.…
Notice history
Procurement timeline
Follow the main stages and updates linked to this procurement procedure.
No other related notice has been identified yet.
Data is restructured for easier reading. The official notice and procurement documents always prevail.
Source and reliability
TED · 462804-2026. Checked on Aug 23, 2026, 12:05 PM.
Data is restructured for easier reading. The official notice and procurement documents always prevail.