Sintesi ufficiale · English
Che cosa viene acquistato?
The Oslo Port of Oslo (HAV) has received a pledge of support from Enova to an onshore power plant for ccs ships at Kneppeskjær east. The facility must meet the requirements in the grant letter from Enova. This includes i.a. the requirements in NEK IEC PAS 80005-3. The procurement is for the procurement of land power installations. In addition the procurement includes the following options: 1. Cost reduction - Land supply system for CCS ships only. 2. Cable tower to CCS 3. Convert 4. Advanced cable management system, quay front 5. Back-up cables 6. Extended service contract The contractual terms for the delivery shall be in accordance with the standard contract terms for Oslo municipality ́s procurement of goods. The land power plant shall supply the ship at Kneppeskjær quay on Sjursøya.…
Traduzione automatica indicativa. Il riepilogo ufficiale resta il riferimento.
Sintesi ufficiale · English
The Oslo Port of Oslo (HAV) has received a pledge of support from Enova to an onshore power plant for ccs ships at Kneppeskjær east. The facility must meet the requirements in the grant letter from Enova. This includes i.a. the requirements in NEK IEC PAS 80005-3. The procurement is for the procurement of land power installations. In addition the procurement includes the following options: 1. Cost reduction - Land supply system for CCS ships only. 2. Cable tower to CCS 3. Convert 4. Advanced cable management system, quay front 5. Back-up cables 6. Extended service contract The contractual terms for the delivery shall be in accordance with the standard contract terms for Oslo municipality ́s procurement of goods. The land power plant shall supply the ship at Kneppeskjær quay on Sjursøya.…
Cronologia dell’avviso
Cronologia della procedura di appalto
Segui le fasi principali e gli aggiornamenti relativi a questa procedura di appalto.
Non è stato ancora individuato nessun altro avviso correlato.
I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.
Fonte e affidabilità
TED · 462804-2026. Verificato il 23 ago 2026, 12:05.
I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.