The Oslo Port of Oslo (HAV) has received a pledge of support from Enova to an onshore power plant for ccs ships at Kneppeskjær east. The facility must meet the requirements in the grant letter from Enova. This includes i.a. the requirements in NEK IEC PAS 80005-3. The procurement is for the procurement of land power installations. In addition the procurement includes the following options: 1. Cost reduction - Land supply system for CCS ships only. 2. Cable tower to CCS 3. Convert 4. Advanced cable management system, quay front 5. Back-up cables 6. Extended service contract The contractual terms for the delivery shall be in accordance with the standard contract terms for Oslo municipality ́s procurement of goods. The land power plant shall supply the ship at Kneppeskjær quay on Sjursøya.…
Traducción automática orientativa. El resumen oficial sigue siendo la referencia.
Resumen oficial · English
The Oslo Port of Oslo (HAV) has received a pledge of support from Enova to an onshore power plant for ccs ships at Kneppeskjær east. The facility must meet the requirements in the grant letter from Enova. This includes i.a. the requirements in NEK IEC PAS 80005-3. The procurement is for the procurement of land power installations. In addition the procurement includes the following options: 1. Cost reduction - Land supply system for CCS ships only. 2. Cable tower to CCS 3. Convert 4. Advanced cable management system, quay front 5. Back-up cables 6. Extended service contract The contractual terms for the delivery shall be in accordance with the standard contract terms for Oslo municipality ́s procurement of goods. The land power plant shall supply the ship at Kneppeskjær quay on Sjursøya.…
Historial del anuncio
Cronología del procedimiento de contratación
Sigue las principales etapas y actualizaciones vinculadas a este procedimiento de contratación.
Todavía no se ha identificado ningún otro anuncio relacionado.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.
Fuente y fiabilidad
TED · 462804-2026. Verificado el 23 ago. 2026 12:05.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.