Official summary
What is being procured?
The emergency works project involves replacing the existing gas proving systems in two science rooms, a home economics room, an engineering and prep room, as well as replacement of flexible gas hoses in the engineering room. The emergency also includes replacement of the 2 existing oil-fired boilers with new LPG gas boilers and heating controls, and replacing current oil tank with a gas tank.
Notice history
Procurement timeline
Follow the main stages and updates linked to this procurement procedure.
Data is restructured for easier reading. The official notice and procurement documents always prevail.
Source and reliability
TED · 427834-2026. Checked on Aug 23, 2026, 5:05 AM.
Data is restructured for easier reading. The official notice and procurement documents always prevail.