Virallinen yhteenveto · English
Mitä hankitaan?
The emergency works project involves replacing the existing gas proving systems in two science rooms, a home economics room, an engineering and prep room, as well as replacement of flexible gas hoses in the engineering room. The emergency also includes replacement of the 2 existing oil-fired boilers with new LPG gas boilers and heating controls, and replacing current oil tank with a gas tank.
Suuntaa antava konekäännös. Virallinen yhteenveto on edelleen ensisijainen.
Virallinen yhteenveto · English
The emergency works project involves replacing the existing gas proving systems in two science rooms, a home economics room, an engineering and prep room, as well as replacement of flexible gas hoses in the engineering room. The emergency also includes replacement of the 2 existing oil-fired boilers with new LPG gas boilers and heating controls, and replacing current oil tank with a gas tank.
Ilmoitushistoria
Hankintamenettelyn aikajana
Seuraa tähän hankintamenettelyyn liittyviä päävaiheita ja päivityksiä.
Tiedot on jäsennetty helpommin luettaviksi. Virallinen ilmoitus ja hankinta-asiakirjat ovat aina ratkaisevia.
Lähde ja luotettavuus
TED · 427834-2026. Tarkistettu 23.8.2026 klo 5.05.
Tiedot on jäsennetty helpommin luettaviksi. Virallinen ilmoitus ja hankinta-asiakirjat ovat aina ratkaisevia.