Oficiali santrauka · English
Kas perkama?
The emergency works project involves replacing the existing gas proving systems in two science rooms, a home economics room, an engineering and prep room, as well as replacement of flexible gas hoses in the engineering room. The emergency also includes replacement of the 2 existing oil-fired boilers with new LPG gas boilers and heating controls, and replacing current oil tank with a gas tank.
Informacinis mašininis vertimas. Oficialiai santraukai ir toliau teikiama pirmenybė.
Oficiali santrauka · English
The emergency works project involves replacing the existing gas proving systems in two science rooms, a home economics room, an engineering and prep room, as well as replacement of flexible gas hoses in the engineering room. The emergency also includes replacement of the 2 existing oil-fired boilers with new LPG gas boilers and heating controls, and replacing current oil tank with a gas tank.
Skelbimo istorija
Pirkimo procedūros laiko juosta
Sekite pagrindinius šios pirkimo procedūros etapus ir atnaujinimus.
Duomenys pertvarkyti, kad būtų lengviau skaityti. Oficialus skelbimas ir pirkimo dokumentai visada turi pirmenybę.
Šaltinis ir patikimumas
TED · 427834-2026. Patikrinta 2026-08-23 05:05.
Duomenys pertvarkyti, kad būtų lengviau skaityti. Oficialus skelbimas ir pirkimo dokumentai visada turi pirmenybę.