The Contracting Authority wants to purchase the complete functional supply of a total of approximately 20 km 220 kV three-core submarine cable (installed as 3 separate, parallel cable systems) containing an optical fibre cable, including all labour, equipment and materials required for design, fabrication and factory testing, transport of cable and accessories to a port in Zealand, Denmark, installation of transition joints and hang offs and completion and commissioning as a part of a three new 220 kV cable system connecting Vordingborg Nord (VONØ) substation to Eskilstrup (ESK) and Nørre Radsted (NRA) substations. For further details concerning the purchase, reference is made to the tender documents.
Orientačný strojový preklad. Rozhodujúci zostáva oficiálny súhrn.
Oficiálne zhrnutie · English
The Contracting Authority wants to purchase the complete functional supply of a total of approximately 20 km 220 kV three-core submarine cable (installed as 3 separate, parallel cable systems) containing an optical fibre cable, including all labour, equipment and materials required for design, fabrication and factory testing, transport of cable and accessories to a port in Zealand, Denmark, installation of transition joints and hang offs and completion and commissioning as a part of a three new 220 kV cable system connecting Vordingborg Nord (VONØ) substation to Eskilstrup (ESK) and Nørre Radsted (NRA) substations. For further details concerning the purchase, reference is made to the tender documents.
História oznámení
Časová os verejného obstarávania
Sledujte hlavné etapy a aktualizácie súvisiace s týmto postupom verejného obstarávania.
Zatiaľ sa nenašlo žiadne ďalšie súvisiace oznámenie.
Údaje sú upravené na ľahšie čítanie. Oficiálne oznámenie a súťažné podklady majú vždy prednosť.
Zdroj a spoľahlivosť
TED · 655836-2026. Overené 23. 9. 2026, 11:05.