Официално резюме · English
Какво се възлага?
The Contracting Authority wants to purchase the complete functional supply of a total of approximately 20 km 220 kV three-core submarine cable (installed as 3 separate, parallel cable systems) containing an optical fibre cable, including all labour, equipment and materials required for design, fabrication and factory testing, transport of cable and accessories to a port in Zealand, Denmark, installation of transition joints and hang offs and completion and commissioning as a part of a three new 220 kV cable system connecting Vordingborg Nord (VONØ) substation to Eskilstrup (ESK) and Nørre Radsted (NRA) substations. For further details concerning the purchase, reference is made to the tender documents.
Машинен превод за ориентация. Официалното резюме остава меродавно.
Официално резюме · English
The Contracting Authority wants to purchase the complete functional supply of a total of approximately 20 km 220 kV three-core submarine cable (installed as 3 separate, parallel cable systems) containing an optical fibre cable, including all labour, equipment and materials required for design, fabrication and factory testing, transport of cable and accessories to a port in Zealand, Denmark, installation of transition joints and hang offs and completion and commissioning as a part of a three new 220 kV cable system connecting Vordingborg Nord (VONØ) substation to Eskilstrup (ESK) and Nørre Radsted (NRA) substations. For further details concerning the purchase, reference is made to the tender documents.
История на обявлението
Хронология на процедурата за възлагане
Проследете основните етапи и актуализации, свързани с тази процедура за възлагане.
Все още не е открито друго свързано обявление.
Данните са преструктурирани за по-лесно четене. Официалното обявление и документите винаги имат предимство.
Източник и надеждност
TED · 655836-2026. Проверено на 23.09.2026 г., 11:05 ч..