Officielt resumé · English
Hvad indkøbes?
The Contracting Authority wants to purchase the complete functional supply of a total of approximately 20 km 220 kV three-core submarine cable (installed as 3 separate, parallel cable systems) containing an optical fibre cable, including all labour, equipment and materials required for design, fabrication and factory testing, transport of cable and accessories to a port in Zealand, Denmark, installation of transition joints and hang offs and completion and commissioning as a part of a three new 220 kV cable system connecting Vordingborg Nord (VONØ) substation to Eskilstrup (ESK) and Nørre Radsted (NRA) substations. For further details concerning the purchase, reference is made to the tender documents.
Vejledende maskinoversættelse. Det officielle resumé er fortsat gældende.
Officielt resumé · English
The Contracting Authority wants to purchase the complete functional supply of a total of approximately 20 km 220 kV three-core submarine cable (installed as 3 separate, parallel cable systems) containing an optical fibre cable, including all labour, equipment and materials required for design, fabrication and factory testing, transport of cable and accessories to a port in Zealand, Denmark, installation of transition joints and hang offs and completion and commissioning as a part of a three new 220 kV cable system connecting Vordingborg Nord (VONØ) substation to Eskilstrup (ESK) and Nørre Radsted (NRA) substations. For further details concerning the purchase, reference is made to the tender documents.
Meddelelseshistorik
Udbudsforløb
Følg de vigtigste faser og opdateringer i dette udbud.
Der er endnu ikke fundet en anden relateret meddelelse.
Data er omstruktureret for at være lettere at læse. Den officielle meddelelse og udbudsdokumenterne er altid gældende.
Kilde og pålidelighed
TED · 655836-2026. Kontrolleret 23. sep. 2026 11.05.
Data er omstruktureret for at være lettere at læse. Den officielle meddelelse og udbudsdokumenterne er altid gældende.