Donegal County Council intends to carry Phase 3 of the existing 'Muckish Railway Walk', a 3.5km which will include the following: • replacement of a bridge structure • provision of two small car parks • Extensive drainage improvements over the 3.5km length of the project • provision of new surfacing over the extent of the project • provision of safety fencing where required • provision of access controls at various locations • provision of information panels, seating and cycle stands • all ancillary works including any other works as described or inferred on the drawings
Orientačný strojový preklad. Rozhodujúci zostáva oficiálny súhrn.
Oficiálne zhrnutie · English
Donegal County Council intends to carry Phase 3 of the existing 'Muckish Railway Walk', a 3.5km which will include the following: • replacement of a bridge structure • provision of two small car parks • Extensive drainage improvements over the 3.5km length of the project • provision of new surfacing over the extent of the project • provision of safety fencing where required • provision of access controls at various locations • provision of information panels, seating and cycle stands • all ancillary works including any other works as described or inferred on the drawings
História oznámení
Časová os verejného obstarávania
Sledujte hlavné etapy a aktualizácie súvisiace s týmto postupom verejného obstarávania.
Zatiaľ sa nenašlo žiadne ďalšie súvisiace oznámenie.
Údaje sú upravené na ľahšie čítanie. Oficiálne oznámenie a súťažné podklady majú vždy prednosť.
Zdroj a spoľahlivosť
TED · 597465-2026. Overené 3. 9. 2026, 10:05.
Údaje sú upravené na ľahšie čítanie. Oficiálne oznámenie a súťažné podklady majú vždy prednosť.