Uradni povzetek · English
Kaj je predmet naročila?
Donegal County Council intends to carry Phase 3 of the existing 'Muckish Railway Walk', a 3.5km which will include the following: • replacement of a bridge structure • provision of two small car parks • Extensive drainage improvements over the 3.5km length of the project • provision of new surfacing over the extent of the project • provision of safety fencing where required • provision of access controls at various locations • provision of information panels, seating and cycle stands • all ancillary works including any other works as described or inferred on the drawings
Informativni strojni prevod. Uradni povzetek ostaja merodajen.
Uradni povzetek · English
Donegal County Council intends to carry Phase 3 of the existing 'Muckish Railway Walk', a 3.5km which will include the following: • replacement of a bridge structure • provision of two small car parks • Extensive drainage improvements over the 3.5km length of the project • provision of new surfacing over the extent of the project • provision of safety fencing where required • provision of access controls at various locations • provision of information panels, seating and cycle stands • all ancillary works including any other works as described or inferred on the drawings
Zgodovina obvestil
Časovnica postopka javnega naročanja
Spremljajte glavne faze in posodobitve, povezane s tem postopkom javnega naročanja.
Za zdaj ni bilo najdeno nobeno drugo povezano obvestilo.
Podatki so preurejeni za lažje branje. Uradno obvestilo in razpisna dokumentacija vedno veljata.
Vir in zanesljivost
TED · 597465-2026. Preverjeno 3. sep. 2026 10:05.
Podatki so preurejeni za lažje branje. Uradno obvestilo in razpisna dokumentacija vedno veljata.