Donegal County Council intends to carry Phase 3 of the existing 'Muckish Railway Walk', a 3.5km which will include the following: • replacement of a bridge structure • provision of two small car parks • Extensive drainage improvements over the 3.5km length of the project • provision of new surfacing over the extent of the project • provision of safety fencing where required • provision of access controls at various locations • provision of information panels, seating and cycle stands • all ancillary works including any other works as described or inferred on the drawings
Machinevertaling ter ondersteuning. De officiële samenvatting blijft leidend.
Officiële samenvatting · English
Donegal County Council intends to carry Phase 3 of the existing 'Muckish Railway Walk', a 3.5km which will include the following: • replacement of a bridge structure • provision of two small car parks • Extensive drainage improvements over the 3.5km length of the project • provision of new surfacing over the extent of the project • provision of safety fencing where required • provision of access controls at various locations • provision of information panels, seating and cycle stands • all ancillary works including any other works as described or inferred on the drawings
Historie van de aankondiging
Tijdlijn van de aanbestedingsprocedure
Volg de belangrijkste fasen en updates van deze aanbestedingsprocedure.
Er is nog geen andere gerelateerde aankondiging gevonden.
-
Aankondiging van het resultaat Huidige aankondiging
· TED 597465-2026
Officiële aankondiging openen ↗
De gegevens zijn voor een betere leesbaarheid geordend. De officiële aankondiging en aanbestedingsstukken zijn altijd doorslaggevend.
Bron en betrouwbaarheid
TED · 597465-2026. Gecontroleerd op 3 sep. 2026 10:05.
De gegevens zijn voor een betere leesbaarheid geordend. De officiële aankondiging en aanbestedingsstukken zijn altijd doorslaggevend.