Donegal County Council intends to carry Phase 3 of the existing 'Muckish Railway Walk', a 3.5km which will include the following: • replacement of a bridge structure • provision of two small car parks • Extensive drainage improvements over the 3.5km length of the project • provision of new surfacing over the extent of the project • provision of safety fencing where required • provision of access controls at various locations • provision of information panels, seating and cycle stands • all ancillary works including any other works as described or inferred on the drawings
Strojni prijevod za lakše razumijevanje. Službeni sažetak ostaje mjerodavan.
Službeni sažetak · English
Donegal County Council intends to carry Phase 3 of the existing 'Muckish Railway Walk', a 3.5km which will include the following: • replacement of a bridge structure • provision of two small car parks • Extensive drainage improvements over the 3.5km length of the project • provision of new surfacing over the extent of the project • provision of safety fencing where required • provision of access controls at various locations • provision of information panels, seating and cycle stands • all ancillary works including any other works as described or inferred on the drawings
Povijest obavijesti
Vremenski slijed postupka nabave
Pratite glavne faze i izmjene povezane s ovim postupkom nabave.
Još nije pronađena nijedna druga povezana obavijest.
Podaci su preuređeni radi lakšeg čitanja. Službena obavijest i dokumentacija uvijek imaju prednost.
Izvor i pouzdanost
TED · 597465-2026. Provjereno 3. ruj 2026. 10:05.
Podaci su preuređeni radi lakšeg čitanja. Službena obavijest i dokumentacija uvijek imaju prednost.