Oficiálne zhrnutie · English
Čo je predmetom obstarávania?
The contracting authority needs one soil drilling rig on track. The objective of the procurement is to carry out geotechnical ground surveys for new construction and maintenance of roads. The assignment involves delivery and training and use of the test drilling rig. A service contract will be kept out of this procurement as a separate. The rig that shall be procured shall replace the current rig, which is 12 years and worn out.
Orientačný strojový preklad. Rozhodujúci zostáva oficiálny súhrn.
Oficiálne zhrnutie · English
The contracting authority needs one soil drilling rig on track. The objective of the procurement is to carry out geotechnical ground surveys for new construction and maintenance of roads. The assignment involves delivery and training and use of the test drilling rig. A service contract will be kept out of this procurement as a separate. The rig that shall be procured shall replace the current rig, which is 12 years and worn out.
História oznámení
Časová os verejného obstarávania
Sledujte hlavné etapy a aktualizácie súvisiace s týmto postupom verejného obstarávania.
Údaje sú upravené na ľahšie čítanie. Oficiálne oznámenie a súťažné podklady majú vždy prednosť.
Zdroj a spoľahlivosť
TED · 482435-2026. Overené 23. 8. 2026, 16:05.
Údaje sú upravené na ľahšie čítanie. Oficiálne oznámenie a súťažné podklady majú vždy prednosť.