Službeni sažetak · English
Što se nabavlja?
The contracting authority needs one soil drilling rig on track. The objective of the procurement is to carry out geotechnical ground surveys for new construction and maintenance of roads. The assignment involves delivery and training and use of the test drilling rig. A service contract will be kept out of this procurement as a separate. The rig that shall be procured shall replace the current rig, which is 12 years and worn out.
Strojni prijevod za lakše razumijevanje. Službeni sažetak ostaje mjerodavan.
Službeni sažetak · English
The contracting authority needs one soil drilling rig on track. The objective of the procurement is to carry out geotechnical ground surveys for new construction and maintenance of roads. The assignment involves delivery and training and use of the test drilling rig. A service contract will be kept out of this procurement as a separate. The rig that shall be procured shall replace the current rig, which is 12 years and worn out.
Povijest obavijesti
Vremenski slijed postupka nabave
Pratite glavne faze i izmjene povezane s ovim postupkom nabave.
Podaci su preuređeni radi lakšeg čitanja. Službena obavijest i dokumentacija uvijek imaju prednost.
Izvor i pouzdanost
TED · 482435-2026. Provjereno 23. kol 2026. 16:05.
Podaci su preuređeni radi lakšeg čitanja. Službena obavijest i dokumentacija uvijek imaju prednost.