Официално резюме · English
Какво се възлага?
The contracting authority needs one soil drilling rig on track. The objective of the procurement is to carry out geotechnical ground surveys for new construction and maintenance of roads. The assignment involves delivery and training and use of the test drilling rig. A service contract will be kept out of this procurement as a separate. The rig that shall be procured shall replace the current rig, which is 12 years and worn out.
Машинен превод за ориентация. Официалното резюме остава меродавно.
Официално резюме · English
The contracting authority needs one soil drilling rig on track. The objective of the procurement is to carry out geotechnical ground surveys for new construction and maintenance of roads. The assignment involves delivery and training and use of the test drilling rig. A service contract will be kept out of this procurement as a separate. The rig that shall be procured shall replace the current rig, which is 12 years and worn out.
История на обявлението
Хронология на процедурата за възлагане
Проследете основните етапи и актуализации, свързани с тази процедура за възлагане.
Данните са преструктурирани за по-лесно четене. Официалното обявление и документите винаги имат предимство.
Източник и надеждност
TED · 482435-2026. Проверено на 23.08.2026 г., 16:05 ч..
Данните са преструктурирани за по-лесно четене. Официалното обявление и документите винаги имат предимство.