Rezumat oficial · English
Ce se achiziționează?
The contracting authority needs one soil drilling rig on track. The objective of the procurement is to carry out geotechnical ground surveys for new construction and maintenance of roads. The assignment involves delivery and training and use of the test drilling rig. A service contract will be kept out of this procurement as a separate. The rig that shall be procured shall replace the current rig, which is 12 years and worn out.
Traducere automată orientativă. Rezumatul oficial rămâne referința.
Rezumat oficial · English
The contracting authority needs one soil drilling rig on track. The objective of the procurement is to carry out geotechnical ground surveys for new construction and maintenance of roads. The assignment involves delivery and training and use of the test drilling rig. A service contract will be kept out of this procurement as a separate. The rig that shall be procured shall replace the current rig, which is 12 years and worn out.
Istoricul anunțului
Cronologia procedurii de achiziție
Urmăriți principalele etape și actualizări legate de această procedură de achiziție.
Datele sunt restructurate pentru o lectură mai ușoară. Anunțul oficial și documentele achiziției prevalează întotdeauna.
Sursă și fiabilitate
TED · 482435-2026. Verificat la 23 aug. 2026, 16:05.
Datele sunt restructurate pentru o lectură mai ușoară. Anunțul oficial și documentele achiziției prevalează întotdeauna.