Sommarju uffiċjali · English
X’qed jiġi akkwistat?
The proposed scheme involves the construction of pedestrian and cycle facilities through the Village of Birdhill between the Speed limits on the west side of the Village and the northern arm of Birdhill Roundabout to the east of the village. In overall terms the scheme involves cycle facilities and footpaths, full depth construction at Bus Stops, uncontrolled crossings and a toucan crossing.
Traduzzjoni awtomatika indikattiva. Is-sommarju uffiċjali jibqa’ r-referenza.
Sommarju uffiċjali · English
The proposed scheme involves the construction of pedestrian and cycle facilities through the Village of Birdhill between the Speed limits on the west side of the Village and the northern arm of Birdhill Roundabout to the east of the village. In overall terms the scheme involves cycle facilities and footpaths, full depth construction at Bus Stops, uncontrolled crossings and a toucan crossing.
Storja tal-avviżi
Kronoloġija tal-akkwist
Segwi l-istadji ewlenin u l-aġġornamenti marbuta ma’ din il-proċedura ta’ akkwist.
S’issa ma ġie identifikat l-ebda avviż ieħor relatat.
Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.
Sors u affidabbiltà
TED · 562111-2026. Iċċekkjat fil-24 Aww 2026 17:05.
Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.