Virallinen yhteenveto · English
Mitä hankitaan?
The proposed scheme involves the construction of pedestrian and cycle facilities through the Village of Birdhill between the Speed limits on the west side of the Village and the northern arm of Birdhill Roundabout to the east of the village. In overall terms the scheme involves cycle facilities and footpaths, full depth construction at Bus Stops, uncontrolled crossings and a toucan crossing.
Suuntaa antava konekäännös. Virallinen yhteenveto on edelleen ensisijainen.
Virallinen yhteenveto · English
The proposed scheme involves the construction of pedestrian and cycle facilities through the Village of Birdhill between the Speed limits on the west side of the Village and the northern arm of Birdhill Roundabout to the east of the village. In overall terms the scheme involves cycle facilities and footpaths, full depth construction at Bus Stops, uncontrolled crossings and a toucan crossing.
Ilmoitushistoria
Hankintamenettelyn aikajana
Seuraa tähän hankintamenettelyyn liittyviä päävaiheita ja päivityksiä.
Muita tähän liittyviä ilmoituksia ei ole vielä tunnistettu.
Tiedot on jäsennetty helpommin luettaviksi. Virallinen ilmoitus ja hankinta-asiakirjat ovat aina ratkaisevia.
Lähde ja luotettavuus
TED · 562111-2026. Tarkistettu 24.8.2026 klo 17.05.
Tiedot on jäsennetty helpommin luettaviksi. Virallinen ilmoitus ja hankinta-asiakirjat ovat aina ratkaisevia.