Résumé officiel · English
Quel est l’objet du marché ?
The proposed scheme involves the construction of pedestrian and cycle facilities through the Village of Birdhill between the Speed limits on the west side of the Village and the northern arm of Birdhill Roundabout to the east of the village. In overall terms the scheme involves cycle facilities and footpaths, full depth construction at Bus Stops, uncontrolled crossings and a toucan crossing.
Traduction automatique indicative. Le résumé officiel reste la référence.
Résumé officiel · English
The proposed scheme involves the construction of pedestrian and cycle facilities through the Village of Birdhill between the Speed limits on the west side of the Village and the northern arm of Birdhill Roundabout to the east of the village. In overall terms the scheme involves cycle facilities and footpaths, full depth construction at Bus Stops, uncontrolled crossings and a toucan crossing.
Historique de l’avis
Chronologie de la procédure
Suivez les principales étapes et mises à jour liées à cette procédure de passation.
Aucun autre avis lié n’a encore été identifié.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.
Source et fiabilité
TED · 562111-2026. Vérifié le 24 août 2026 à 17:05.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.