Ametlik kokkuvõte · English
Mida hangitakse?
The proposed scheme involves the construction of pedestrian and cycle facilities through the Village of Birdhill between the Speed limits on the west side of the Village and the northern arm of Birdhill Roundabout to the east of the village. In overall terms the scheme involves cycle facilities and footpaths, full depth construction at Bus Stops, uncontrolled crossings and a toucan crossing.
Abistav masintõlge. Ametlik kokkuvõte jääb määravaks.
Ametlik kokkuvõte · English
The proposed scheme involves the construction of pedestrian and cycle facilities through the Village of Birdhill between the Speed limits on the west side of the Village and the northern arm of Birdhill Roundabout to the east of the village. In overall terms the scheme involves cycle facilities and footpaths, full depth construction at Bus Stops, uncontrolled crossings and a toucan crossing.
Tasuta
Saage selle valdkonna järgmised hanked
Saate kord nädalas e-kirja uute teadetega, mis vastavad teie tingimustele. Enne tasuta teavituse aktiveerimist kontrollige või muutke tingimusi.
Teate ajalugu
Hankemenetluse ajajoon
Jälgige selle hankemenetlusega seotud põhietappe ja uuendusi.
Ühtegi muud seotud teadet ei ole veel tuvastatud.
Andmed on lihtsamaks lugemiseks ümber struktureeritud. Alati on ülimuslikud ametlik teade ja hankedokumendid.
Allikas ja usaldusväärsus
TED · 562111-2026. Kontrollitud 24. aug 2026 17:05.
Andmed on lihtsamaks lugemiseks ümber struktureeritud. Alati on ülimuslikud ametlik teade ja hankedokumendid.