Oficiālais kopsavilkums · English
Kas tiek iepirkts?
The proposed scheme involves the construction of pedestrian and cycle facilities through the Village of Birdhill between the Speed limits on the west side of the Village and the northern arm of Birdhill Roundabout to the east of the village. In overall terms the scheme involves cycle facilities and footpaths, full depth construction at Bus Stops, uncontrolled crossings and a toucan crossing.
Informatīvs mašīntulkojums. Oficiālais kopsavilkums joprojām ir noteicošais.
Oficiālais kopsavilkums · English
The proposed scheme involves the construction of pedestrian and cycle facilities through the Village of Birdhill between the Speed limits on the west side of the Village and the northern arm of Birdhill Roundabout to the east of the village. In overall terms the scheme involves cycle facilities and footpaths, full depth construction at Bus Stops, uncontrolled crossings and a toucan crossing.
Paziņojuma vēsture
Iepirkuma procedūras laika skala
Sekojiet galvenajiem posmiem un atjauninājumiem, kas saistīti ar šo iepirkuma procedūru.
Cits saistīts paziņojums vēl nav identificēts.
Dati ir pārstrukturēti vieglākai lasīšanai. Oficiālais paziņojums un iepirkuma dokumenti vienmēr ir noteicošie.
Avots un uzticamība
TED · 562111-2026. Pārbaudīts 2026. gada 24. aug. 17:05.
Dati ir pārstrukturēti vieglākai lasīšanai. Oficiālais paziņojums un iepirkuma dokumenti vienmēr ir noteicošie.