The contracting authority intends to award a design-build (turnkey) contract for the establishment of the Øygarden substasjon. The project includes both design and construction of a complete class 3 substation, including buildings, technical installations, and associated infrastructure. The contract also covers the installation of cable systems and routing, including a new line connection between Blomøy and the new substasjon, as well as demolition of selected parts of the existing grid. The design-build contractor will be responsible for the entire delivery, from detailed design and procurement to execution and completion, in accordance with applicable laws, regulations, and standards. All relevant disciplines are included (civil works, HVAC, electrical, telecommunications, and automation
Traducción automática orientativa. El resumen oficial sigue siendo la referencia.
Resumen oficial · English
The contracting authority intends to award a design-build (turnkey) contract for the establishment of the Øygarden substasjon. The project includes both design and construction of a complete class 3 substation, including buildings, technical installations, and associated infrastructure. The contract also covers the installation of cable systems and routing, including a new line connection between Blomøy and the new substasjon, as well as demolition of selected parts of the existing grid. The design-build contractor will be responsible for the entire delivery, from detailed design and procurement to execution and completion, in accordance with applicable laws, regulations, and standards. All relevant disciplines are included (civil works, HVAC, electrical, telecommunications, and automation
Gratis
Reciba las próximas licitaciones de este sector
Reciba nuevos anuncios que coincidan con sus criterios en un correo semanal. Revise o ajuste los criterios antes de activar su alerta gratuita.
Historial del anuncio
Cronología del procedimiento de contratación
Sigue las principales etapas y actualizaciones vinculadas a este procedimiento de contratación.
Todavía no se ha identificado ningún otro anuncio relacionado.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.
Fuente y fiabilidad
TED · 448421-2026. Verificado el 23 ago. 2026 10:05.