The contracting authority intends to award a design-build (turnkey) contract for the establishment of the Øygarden substasjon. The project includes both design and construction of a complete class 3 substation, including buildings, technical installations, and associated infrastructure. The contract also covers the installation of cable systems and routing, including a new line connection between Blomøy and the new substasjon, as well as demolition of selected parts of the existing grid. The design-build contractor will be responsible for the entire delivery, from detailed design and procurement to execution and completion, in accordance with applicable laws, regulations, and standards. All relevant disciplines are included (civil works, HVAC, electrical, telecommunications, and automation
Tradução automática indicativa. O resumo oficial continua a ser a referência.
Resumo oficial · English
The contracting authority intends to award a design-build (turnkey) contract for the establishment of the Øygarden substasjon. The project includes both design and construction of a complete class 3 substation, including buildings, technical installations, and associated infrastructure. The contract also covers the installation of cable systems and routing, including a new line connection between Blomøy and the new substasjon, as well as demolition of selected parts of the existing grid. The design-build contractor will be responsible for the entire delivery, from detailed design and procurement to execution and completion, in accordance with applicable laws, regulations, and standards. All relevant disciplines are included (civil works, HVAC, electrical, telecommunications, and automation
Histórico do anúncio
Cronologia do procedimento de contratação pública
Acompanhe as principais etapas e atualizações associadas a este procedimento de contratação pública.
Ainda não foi identificado nenhum outro anúncio relacionado.
Os dados são reorganizados para facilitar a leitura. O anúncio oficial e os documentos do concurso prevalecem sempre.
Fonte e fiabilidade
TED · 448421-2026. Verificado em 23 de ago de 2026 10:05.
Os dados são reorganizados para facilitar a leitura. O anúncio oficial e os documentos do concurso prevalecem sempre.