The contracting authority intends to award a design-build (turnkey) contract for the establishment of the Øygarden substasjon. The project includes both design and construction of a complete class 3 substation, including buildings, technical installations, and associated infrastructure. The contract also covers the installation of cable systems and routing, including a new line connection between Blomøy and the new substasjon, as well as demolition of selected parts of the existing grid. The design-build contractor will be responsible for the entire delivery, from detailed design and procurement to execution and completion, in accordance with applicable laws, regulations, and standards. All relevant disciplines are included (civil works, HVAC, electrical, telecommunications, and automation
Traduction automatique indicative. Le résumé officiel reste la référence.
Résumé officiel · English
The contracting authority intends to award a design-build (turnkey) contract for the establishment of the Øygarden substasjon. The project includes both design and construction of a complete class 3 substation, including buildings, technical installations, and associated infrastructure. The contract also covers the installation of cable systems and routing, including a new line connection between Blomøy and the new substasjon, as well as demolition of selected parts of the existing grid. The design-build contractor will be responsible for the entire delivery, from detailed design and procurement to execution and completion, in accordance with applicable laws, regulations, and standards. All relevant disciplines are included (civil works, HVAC, electrical, telecommunications, and automation
Historique de l’avis
Chronologie de la procédure
Suivez les principales étapes et mises à jour liées à cette procédure de passation.
Aucun autre avis lié n’a encore été identifié.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.
Source et fiabilité
TED · 448421-2026. Vérifié le 23 août 2026 à 10:05.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.