Resumen oficial · English
¿Qué se contrata?
This defines the Planned Preventative Maintenance (PPM) requirements applicable to the Mechanical Fitter Contract. PPM activities shall be carried out in accordance with OEM recommendations, good engineering practice, HPRA GMP requirements (where applicable), and IBTS policies and procedures. This Annex must be read in conjunction with (URS) (Asset Register).
Traducción automática orientativa. El resumen oficial sigue siendo la referencia.
Resumen oficial · English
This defines the Planned Preventative Maintenance (PPM) requirements applicable to the Mechanical Fitter Contract. PPM activities shall be carried out in accordance with OEM recommendations, good engineering practice, HPRA GMP requirements (where applicable), and IBTS policies and procedures. This Annex must be read in conjunction with (URS) (Asset Register).
Historial del anuncio
Cronología del procedimiento de contratación
Sigue las principales etapas y actualizaciones vinculadas a este procedimiento de contratación.
Todavía no se ha identificado ningún otro anuncio relacionado.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.
Fuente y fiabilidad
TED · 428904-2026. Verificado el 23 ago. 2026 6:05.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.