Amtliche Zusammenfassung · English
Was wird beschafft?
This defines the Planned Preventative Maintenance (PPM) requirements applicable to the Mechanical Fitter Contract. PPM activities shall be carried out in accordance with OEM recommendations, good engineering practice, HPRA GMP requirements (where applicable), and IBTS policies and procedures. This Annex must be read in conjunction with (URS) (Asset Register).
Unverbindliche maschinelle Übersetzung. Die offizielle Zusammenfassung bleibt maßgeblich.
Amtliche Zusammenfassung · English
This defines the Planned Preventative Maintenance (PPM) requirements applicable to the Mechanical Fitter Contract. PPM activities shall be carried out in accordance with OEM recommendations, good engineering practice, HPRA GMP requirements (where applicable), and IBTS policies and procedures. This Annex must be read in conjunction with (URS) (Asset Register).
Bekanntmachungsverlauf
Zeitlicher Ablauf des Vergabeverfahrens
Verfolgen Sie die wichtigsten Phasen und Aktualisierungen dieses Vergabeverfahrens.
Bisher wurde keine weitere zugehörige Bekanntmachung ermittelt.
-
Bekanntmachung vergebener Aufträge Aktuelle Bekanntmachung
· TED 428904-2026
Amtliche Bekanntmachung öffnen ↗
Die Daten werden für eine leichtere Lesbarkeit neu strukturiert. Maßgeblich sind stets die amtliche Bekanntmachung und die Vergabeunterlagen.
Quelle und Verlässlichkeit
TED · 428904-2026. Geprüft am 23.08.2026, 06:05.
Die Daten werden für eine leichtere Lesbarkeit neu strukturiert. Maßgeblich sind stets die amtliche Bekanntmachung und die Vergabeunterlagen.