Oficiālais kopsavilkums · English
Kas tiek iepirkts?
This defines the Planned Preventative Maintenance (PPM) requirements applicable to the Mechanical Fitter Contract. PPM activities shall be carried out in accordance with OEM recommendations, good engineering practice, HPRA GMP requirements (where applicable), and IBTS policies and procedures. This Annex must be read in conjunction with (URS) (Asset Register).
Informatīvs mašīntulkojums. Oficiālais kopsavilkums joprojām ir noteicošais.
Oficiālais kopsavilkums · English
This defines the Planned Preventative Maintenance (PPM) requirements applicable to the Mechanical Fitter Contract. PPM activities shall be carried out in accordance with OEM recommendations, good engineering practice, HPRA GMP requirements (where applicable), and IBTS policies and procedures. This Annex must be read in conjunction with (URS) (Asset Register).
Paziņojuma vēsture
Iepirkuma procedūras laika skala
Sekojiet galvenajiem posmiem un atjauninājumiem, kas saistīti ar šo iepirkuma procedūru.
Cits saistīts paziņojums vēl nav identificēts.
Dati ir pārstrukturēti vieglākai lasīšanai. Oficiālais paziņojums un iepirkuma dokumenti vienmēr ir noteicošie.
Avots un uzticamība
TED · 428904-2026. Pārbaudīts 2026. gada 23. aug. 06:05.
Dati ir pārstrukturēti vieglākai lasīšanai. Oficiālais paziņojums un iepirkuma dokumenti vienmēr ir noteicošie.