Sommarju uffiċjali · English
X’qed jiġi akkwistat?
This defines the Planned Preventative Maintenance (PPM) requirements applicable to the Mechanical Fitter Contract. PPM activities shall be carried out in accordance with OEM recommendations, good engineering practice, HPRA GMP requirements (where applicable), and IBTS policies and procedures. This Annex must be read in conjunction with (URS) (Asset Register).
Traduzzjoni awtomatika indikattiva. Is-sommarju uffiċjali jibqa’ r-referenza.
Sommarju uffiċjali · English
This defines the Planned Preventative Maintenance (PPM) requirements applicable to the Mechanical Fitter Contract. PPM activities shall be carried out in accordance with OEM recommendations, good engineering practice, HPRA GMP requirements (where applicable), and IBTS policies and procedures. This Annex must be read in conjunction with (URS) (Asset Register).
Storja tal-avviżi
Kronoloġija tal-akkwist
Segwi l-istadji ewlenin u l-aġġornamenti marbuta ma’ din il-proċedura ta’ akkwist.
S’issa ma ġie identifikat l-ebda avviż ieħor relatat.
Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.
Sors u affidabbiltà
TED · 428904-2026. Iċċekkjat fil-23 Aww 2026 06:05.
Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.