Resumen oficial · Nederlands
¿Qué se contrata?
The contract is awarded via a negotiated procedure without prior notification to the Global Earthquake Model Foundation (GEM), in accordance with Article 42, §1, 1°, c) of the Law of 17 June 2016 on Public Procurement, as well as the applicable provisions of the Royal Decree on Placement of 18 April 2017. The requested seismic hazard analysis is based on a specific and integrated methodological framework developed and proposed by GEM in close cooperation with the Royal Observatory of Belgium (ROB).…
Traducción automática orientativa. El resumen oficial sigue siendo la referencia.
Resumen oficial · Nederlands
The contract is awarded via a negotiated procedure without prior notification to the Global Earthquake Model Foundation (GEM), in accordance with Article 42, §1, 1°, c) of the Law of 17 June 2016 on Public Procurement, as well as the applicable provisions of the Royal Decree on Placement of 18 April 2017. The requested seismic hazard analysis is based on a specific and integrated methodological framework developed and proposed by GEM in close cooperation with the Royal Observatory of Belgium (ROB).…
Historial del anuncio
Cronología del procedimiento de contratación
Sigue las principales etapas y actualizaciones vinculadas a este procedimiento de contratación.
Todavía no se ha identificado ningún otro anuncio relacionado.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.
Fuente y fiabilidad
TED · 388845-2026. Verificado el 22 ago. 2026 19:05.
Los datos se reestructuran para facilitar su lectura. El anuncio oficial y los documentos de contratación siempre prevalecen.