Amtliche Zusammenfassung · Nederlands
Was wird beschafft?
The contract is awarded via a negotiated procedure without prior notification to the Global Earthquake Model Foundation (GEM), in accordance with Article 42, §1, 1°, c) of the Law of 17 June 2016 on Public Procurement, as well as the applicable provisions of the Royal Decree on Placement of 18 April 2017. The requested seismic hazard analysis is based on a specific and integrated methodological framework developed and proposed by GEM in close cooperation with the Royal Observatory of Belgium (ROB).…
Unverbindliche maschinelle Übersetzung. Die offizielle Zusammenfassung bleibt maßgeblich.
Amtliche Zusammenfassung · Nederlands
The contract is awarded via a negotiated procedure without prior notification to the Global Earthquake Model Foundation (GEM), in accordance with Article 42, §1, 1°, c) of the Law of 17 June 2016 on Public Procurement, as well as the applicable provisions of the Royal Decree on Placement of 18 April 2017. The requested seismic hazard analysis is based on a specific and integrated methodological framework developed and proposed by GEM in close cooperation with the Royal Observatory of Belgium (ROB).…
Bekanntmachungsverlauf
Zeitlicher Ablauf des Vergabeverfahrens
Verfolgen Sie die wichtigsten Phasen und Aktualisierungen dieses Vergabeverfahrens.
Bisher wurde keine weitere zugehörige Bekanntmachung ermittelt.
-
Bekanntmachung vergebener Aufträge Angezeigte Bekanntmachung
· TED 388845-2026
Amtliche Bekanntmachung öffnen ↗
Die Daten werden für eine leichtere Lesbarkeit neu strukturiert. Maßgeblich sind stets die amtliche Bekanntmachung und die Vergabeunterlagen.
Quelle und Verlässlichkeit
TED · 388845-2026. Geprüft am 22.08.2026, 19:05.
Die Daten werden für eine leichtere Lesbarkeit neu strukturiert. Maßgeblich sind stets die amtliche Bekanntmachung und die Vergabeunterlagen.