Sommarju uffiċjali · Nederlands
X’qed jiġi akkwistat?
The contract is awarded via a negotiated procedure without prior notification to the Global Earthquake Model Foundation (GEM), in accordance with Article 42, §1, 1°, c) of the Law of 17 June 2016 on Public Procurement, as well as the applicable provisions of the Royal Decree on Placement of 18 April 2017. The requested seismic hazard analysis is based on a specific and integrated methodological framework developed and proposed by GEM in close cooperation with the Royal Observatory of Belgium (ROB).…
Traduzzjoni awtomatika indikattiva. Is-sommarju uffiċjali jibqa’ r-referenza.
Sommarju uffiċjali · Nederlands
The contract is awarded via a negotiated procedure without prior notification to the Global Earthquake Model Foundation (GEM), in accordance with Article 42, §1, 1°, c) of the Law of 17 June 2016 on Public Procurement, as well as the applicable provisions of the Royal Decree on Placement of 18 April 2017. The requested seismic hazard analysis is based on a specific and integrated methodological framework developed and proposed by GEM in close cooperation with the Royal Observatory of Belgium (ROB).…
Storja tal-avviżi
Kronoloġija tal-akkwist
Segwi l-istadji ewlenin u l-aġġornamenti marbuta ma’ din il-proċedura ta’ akkwist.
S’issa ma ġie identifikat l-ebda avviż ieħor relatat.
Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.
Sors u affidabbiltà
TED · 388845-2026. Iċċekkjat fil-22 Aww 2026 19:05.
Id-data hija ristrutturata biex tinqara aktar faċilment. L-avviż uffiċjali u d-dokumenti tal-akkwist dejjem jipprevalu.