Hivatalos összefoglaló · Nederlands
Mi a beszerzés tárgya?
The contract is awarded via a negotiated procedure without prior notification to the Global Earthquake Model Foundation (GEM), in accordance with Article 42, §1, 1°, c) of the Law of 17 June 2016 on Public Procurement, as well as the applicable provisions of the Royal Decree on Placement of 18 April 2017. The requested seismic hazard analysis is based on a specific and integrated methodological framework developed and proposed by GEM in close cooperation with the Royal Observatory of Belgium (ROB).…
Tájékoztató gépi fordítás. A hivatalos összefoglaló az irányadó.
Hivatalos összefoglaló · Nederlands
The contract is awarded via a negotiated procedure without prior notification to the Global Earthquake Model Foundation (GEM), in accordance with Article 42, §1, 1°, c) of the Law of 17 June 2016 on Public Procurement, as well as the applicable provisions of the Royal Decree on Placement of 18 April 2017. The requested seismic hazard analysis is based on a specific and integrated methodological framework developed and proposed by GEM in close cooperation with the Royal Observatory of Belgium (ROB).…
A hirdetmény előzményei
A közbeszerzési eljárás idővonala
Kövesse a közbeszerzési eljáráshoz kapcsolódó főbb szakaszokat és frissítéseket.
Egyelőre nem azonosítottunk más kapcsolódó hirdetményt.
Az adatokat a könnyebb olvashatóság érdekében átrendezzük. Mindig a hivatalos hirdetmény és a közbeszerzési dokumentumok az irányadók.
Forrás és megbízhatóság
TED · 388845-2026. Ellenőrizve: 2026. aug. 22. 19:05.
Az adatokat a könnyebb olvashatóság érdekében átrendezzük. Mindig a hivatalos hirdetmény és a közbeszerzési dokumentumok az irányadók.