Amtliche Zusammenfassung · English
Was wird beschafft?
The development consists of the circa 2,000 m2 refurbishment of a disused café (Limestone Café) into corporate offices, relocation of the ‘West’ plant room with installation of all new plant at roof level, roof repairs, toilet and welfare upgrade, conversion of Marsh Bar to ancillary queuing area and ancillary works. All works will take place in a live airport terminal building, with all airport operations continuing uninterrupted throughout the construction period.
Unverbindliche maschinelle Übersetzung. Die offizielle Zusammenfassung bleibt maßgeblich.
Amtliche Zusammenfassung · English
The development consists of the circa 2,000 m2 refurbishment of a disused café (Limestone Café) into corporate offices, relocation of the ‘West’ plant room with installation of all new plant at roof level, roof repairs, toilet and welfare upgrade, conversion of Marsh Bar to ancillary queuing area and ancillary works. All works will take place in a live airport terminal building, with all airport operations continuing uninterrupted throughout the construction period.
Bekanntmachungsverlauf
Zeitlicher Ablauf des Vergabeverfahrens
Verfolgen Sie die wichtigsten Phasen und Aktualisierungen dieses Vergabeverfahrens.
Bisher wurde keine weitere zugehörige Bekanntmachung ermittelt.
Die Daten werden für eine leichtere Lesbarkeit neu strukturiert. Maßgeblich sind stets die amtliche Bekanntmachung und die Vergabeunterlagen.
Quelle und Verlässlichkeit
TED · 404911-2026. Geprüft am 22.08.2026, 22:05.
Die Daten werden für eine leichtere Lesbarkeit neu strukturiert. Maßgeblich sind stets die amtliche Bekanntmachung und die Vergabeunterlagen.