Službeni sažetak · English
Što se nabavlja?
The development consists of the circa 2,000 m2 refurbishment of a disused café (Limestone Café) into corporate offices, relocation of the ‘West’ plant room with installation of all new plant at roof level, roof repairs, toilet and welfare upgrade, conversion of Marsh Bar to ancillary queuing area and ancillary works. All works will take place in a live airport terminal building, with all airport operations continuing uninterrupted throughout the construction period.
Strojni prijevod za lakše razumijevanje. Službeni sažetak ostaje mjerodavan.
Službeni sažetak · English
The development consists of the circa 2,000 m2 refurbishment of a disused café (Limestone Café) into corporate offices, relocation of the ‘West’ plant room with installation of all new plant at roof level, roof repairs, toilet and welfare upgrade, conversion of Marsh Bar to ancillary queuing area and ancillary works. All works will take place in a live airport terminal building, with all airport operations continuing uninterrupted throughout the construction period.
Povijest obavijesti
Vremenski slijed postupka nabave
Pratite glavne faze i izmjene povezane s ovim postupkom nabave.
Još nije pronađena nijedna druga povezana obavijest.
Podaci su preuređeni radi lakšeg čitanja. Službena obavijest i dokumentacija uvijek imaju prednost.
Izvor i pouzdanost
TED · 404911-2026. Provjereno 22. kol 2026. 22:05.
Podaci su preuređeni radi lakšeg čitanja. Službena obavijest i dokumentacija uvijek imaju prednost.