Officiell sammanfattning · English
Vad upphandlas?
The development consists of the circa 2,000 m2 refurbishment of a disused café (Limestone Café) into corporate offices, relocation of the ‘West’ plant room with installation of all new plant at roof level, roof repairs, toilet and welfare upgrade, conversion of Marsh Bar to ancillary queuing area and ancillary works. All works will take place in a live airport terminal building, with all airport operations continuing uninterrupted throughout the construction period.
Vägledande maskinöversättning. Den officiella sammanfattningen gäller.
Officiell sammanfattning · English
The development consists of the circa 2,000 m2 refurbishment of a disused café (Limestone Café) into corporate offices, relocation of the ‘West’ plant room with installation of all new plant at roof level, roof repairs, toilet and welfare upgrade, conversion of Marsh Bar to ancillary queuing area and ancillary works. All works will take place in a live airport terminal building, with all airport operations continuing uninterrupted throughout the construction period.
Meddelandehistorik
Tidslinje för upphandlingsförfarandet
Följ de viktigaste stegen och uppdateringarna som är kopplade till det här upphandlingsförfarandet.
Inget annat relaterat meddelande har ännu identifierats.
Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.
Källa och tillförlitlighet
TED · 404911-2026. Kontrollerad 22 aug. 2026 22:05.