Résumé officiel · English
Quel est l’objet du marché ?
The development consists of the circa 2,000 m2 refurbishment of a disused café (Limestone Café) into corporate offices, relocation of the ‘West’ plant room with installation of all new plant at roof level, roof repairs, toilet and welfare upgrade, conversion of Marsh Bar to ancillary queuing area and ancillary works. All works will take place in a live airport terminal building, with all airport operations continuing uninterrupted throughout the construction period.
Traduction automatique indicative. Le résumé officiel reste la référence.
Résumé officiel · English
The development consists of the circa 2,000 m2 refurbishment of a disused café (Limestone Café) into corporate offices, relocation of the ‘West’ plant room with installation of all new plant at roof level, roof repairs, toilet and welfare upgrade, conversion of Marsh Bar to ancillary queuing area and ancillary works. All works will take place in a live airport terminal building, with all airport operations continuing uninterrupted throughout the construction period.
Historique de l’avis
Chronologie de la procédure
Suivez les principales étapes et mises à jour liées à cette procédure de passation.
Aucun autre avis lié n’a encore été identifié.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.
Source et fiabilité
TED · 404911-2026. Vérifié le 22 août 2026 à 22:05.
Les données sont restructurées pour en faciliter la lecture. L’avis officiel et les documents du marché font toujours foi.