Oficiální shrnutí · English
Co je předmětem zakázky?
Upgrade of electricity distribution centre equipment and all related installation, testing and commissioning works including construction and alteration civil works. This project includes the supply, installation and commissioning of power transformers, one shunt reactor, earthing transformers, neutral earthing resistors, remote control cubicles and condition monitoring systems as well cable installations, terminations and earthing. All civil works (construction, alterations and finishings) are included in this project.
Orientační strojový překlad. Rozhodující zůstává oficiální shrnutí.
Oficiální shrnutí · English
Upgrade of electricity distribution centre equipment and all related installation, testing and commissioning works including construction and alteration civil works. This project includes the supply, installation and commissioning of power transformers, one shunt reactor, earthing transformers, neutral earthing resistors, remote control cubicles and condition monitoring systems as well cable installations, terminations and earthing. All civil works (construction, alterations and finishings) are included in this project.
Zdarma
Získejte další zakázky v tomto oboru
Každý týden obdržíte e-mail s novými oznámeními odpovídajícími vašim kritériím. Před aktivací bezplatného upozornění kritéria zkontrolujte nebo upravte.
Historie oznámení
Časová osa zadávacího řízení
Sledujte hlavní fáze a aktualizace spojené s tímto zadávacím řízením.
Dosud nebylo nalezeno žádné další související oznámení.
Data jsou upravena pro snazší čtení. Oficiální oznámení a zadávací dokumentace mají vždy přednost.
Zdroj a spolehlivost
TED · 523148-2026. Ověřeno 24. 8. 2026 6:05.
Data jsou upravena pro snazší čtení. Oficiální oznámení a zadávací dokumentace mají vždy přednost.