Restricted Procedure for the manufacture and laying of 2 x 33 kV Three-Core Submarine Power Cables with embedded FO cable between Malta and Gozo
Enemalta plc
The overall objective of this request is to have one contractor manufacturing and laying two submarine 33kV cables with embedded Fibre Optic cable between Malta and Gozo.
Oficiální shrnutí · English
The overall objective of this request is to have one contractor manufacturing and laying two submarine 33kV cables with embedded Fibre Optic cable between Malta and Gozo.
- Lhůta
- 21. 10. 2026 09:30 UTC+02:00
- Předpokládaná hodnota
- 30 000 000 EUR