Upgrade of electricity distribution centre equipment and all related installation, testing and commissioning works including construction and alteration civil works. This project includes the supply, installation and commissioning of power transformers, one shunt reactor, earthing transformers, neutral earthing resistors, remote control cubicles and condition monitoring systems as well cable installations, terminations and earthing. All civil works (construction, alterations and finishings) are included in this project.
Машинен превод за ориентация. Официалното резюме остава меродавно.
Официално резюме · English
Upgrade of electricity distribution centre equipment and all related installation, testing and commissioning works including construction and alteration civil works. This project includes the supply, installation and commissioning of power transformers, one shunt reactor, earthing transformers, neutral earthing resistors, remote control cubicles and condition monitoring systems as well cable installations, terminations and earthing. All civil works (construction, alterations and finishings) are included in this project.
Безплатно
Получавайте следващите поръчки в този сектор
Получавайте седмичен имейл с нови обявления по вашите критерии. Проверете или променете критериите, преди да активирате безплатното известяване.
История на обявлението
Хронология на процедурата за възлагане
Проследете основните етапи и актуализации, свързани с тази процедура за възлагане.
Все още не е открито друго свързано обявление.
Данните са преструктурирани за по-лесно четене. Официалното обявление и документите винаги имат предимство.
Източник и надеждност
TED · 523148-2026. Проверено на 24.08.2026 г., 6:05 ч..
Данните са преструктурирани за по-лесно четене. Официалното обявление и документите винаги имат предимство.