Sintesi ufficiale · English
Che cosa viene acquistato?
Upgrade of electricity distribution centre equipment and all related installation, testing and commissioning works including construction and alteration civil works. This project includes the supply, installation and commissioning of power transformers, one shunt reactor, earthing transformers, neutral earthing resistors, remote control cubicles and condition monitoring systems as well cable installations, terminations and earthing. All civil works (construction, alterations and finishings) are included in this project.
Traduzione automatica indicativa. Il riepilogo ufficiale resta il riferimento.
Sintesi ufficiale · English
Upgrade of electricity distribution centre equipment and all related installation, testing and commissioning works including construction and alteration civil works. This project includes the supply, installation and commissioning of power transformers, one shunt reactor, earthing transformers, neutral earthing resistors, remote control cubicles and condition monitoring systems as well cable installations, terminations and earthing. All civil works (construction, alterations and finishings) are included in this project.
Gratuito
Ricevi le prossime gare di questo settore
Ricevi ogni settimana un’e-mail con i nuovi avvisi che corrispondono ai tuoi criteri. Verifica o modifica i criteri prima di attivare l’avviso gratuito.
Cronologia dell’avviso
Cronologia della procedura di appalto
Segui le fasi principali e gli aggiornamenti relativi a questa procedura di appalto.
Non è stato ancora individuato nessun altro avviso correlato.
I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.
Fonte e affidabilità
TED · 523148-2026. Verificato il 24 ago 2026, 06:05.
I dati sono riorganizzati per agevolarne la lettura. L’avviso ufficiale e i documenti di gara prevalgono sempre.