Officiell sammanfattning · English
Vad upphandlas?
Upgrade of electricity distribution centre equipment and all related installation, testing and commissioning works including construction and alteration civil works. This project includes the supply, installation and commissioning of power transformers, one shunt reactor, earthing transformers, neutral earthing resistors, remote control cubicles and condition monitoring systems as well cable installations, terminations and earthing. All civil works (construction, alterations and finishings) are included in this project.
Vägledande maskinöversättning. Den officiella sammanfattningen gäller.
Officiell sammanfattning · English
Upgrade of electricity distribution centre equipment and all related installation, testing and commissioning works including construction and alteration civil works. This project includes the supply, installation and commissioning of power transformers, one shunt reactor, earthing transformers, neutral earthing resistors, remote control cubicles and condition monitoring systems as well cable installations, terminations and earthing. All civil works (construction, alterations and finishings) are included in this project.
Gratis
Få nästa upphandlingar inom denna bransch
Få ett veckovis mejl med nya meddelanden som matchar dina kriterier. Kontrollera eller justera kriterierna innan du aktiverar din kostnadsfria bevakning.
Meddelandehistorik
Tidslinje för upphandlingsförfarandet
Följ de viktigaste stegen och uppdateringarna som är kopplade till det här upphandlingsförfarandet.
Inget annat relaterat meddelande har ännu identifierats.
Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.
Källa och tillförlitlighet
TED · 523148-2026. Kontrollerad 24 aug. 2026 06:05.
Uppgifterna har strukturerats om för att bli lättare att läsa. Det officiella meddelandet och upphandlingsdokumenten gäller alltid.