This republication is not an official publication. The data published on www.simap.ch are authoritative.
Kosovo · Petroleum products, fuel, electricity and other sources of energy
Official title · English
Climate Resilience in the Water Sector of Kosovo: Seed Investment: Installation of a PV System - RWC Hidrodrini
Kosovo Energy Efficiency Fund
The Subject of the Contract is the design, supply, installation, testing, commissioning, and handover of a grid-connected photovoltaic (PV) system at the Main Pumping Station of RWC Hidrodrini, on a turnkey basis.The scope of Works and Services, technical requirements, performance criteria, drawings, and all other obligations of the Contractor are fully defined in the Technical Specifications of the Tender Documents.
- Deadline
- Oct 23, 2026 10:00 UTC+02:00
- Estimated value
- Not announced