This republication is not an official publication. The data published on www.simap.ch are authoritative.
Косово · Нефтопродукти, горива, електроенергия и енергия
Официално заглавие · English
Climate Resilience in the Water Sector of Kosovo: Seed Investment: Installation of a PV System - RWC Hidrodrini
Kosovo Energy Efficiency Fund
The Subject of the Contract is the design, supply, installation, testing, commissioning, and handover of a grid-connected photovoltaic (PV) system at the Main Pumping Station of RWC Hidrodrini, on a turnkey basis.The scope of Works and Services, technical requirements, performance criteria, drawings, and all other obligations of the Contractor are fully defined in the Technical Specifications of the Tender Documents.
Официално резюме · English
The Subject of the Contract is the design, supply, installation, testing, commissioning, and handover of a grid-connected photovoltaic (PV) system at the Main Pumping Station of RWC Hidrodrini, on a turnkey basis.The scope of Works and Services, technical requirements, performance criteria, drawings, and all other obligations of the Contractor are fully defined in the Technical Specifications of the Tender Documents.
- Краен срок
- 23.10.2026 г. 10:00 UTC+02:00
- Прогнозна стойност
- Не е обявено