Dies ist keine amtliche Veröffentlichung. Massgebend sind die auf der Plattform www.simap.ch veröffentlichten Daten.
Kosovo · Mineralölerzeugnisse, Brennstoffe, Strom und Energie
Amtlicher Titel · English
Climate Resilience in the Water Sector of Kosovo: Seed Investment: Installation of a PV System - RWC Hidrodrini
Kosovo Energy Efficiency Fund
The Subject of the Contract is the design, supply, installation, testing, commissioning, and handover of a grid-connected photovoltaic (PV) system at the Main Pumping Station of RWC Hidrodrini, on a turnkey basis.The scope of Works and Services, technical requirements, performance criteria, drawings, and all other obligations of the Contractor are fully defined in the Technical Specifications of the Tender Documents.
Amtliche Zusammenfassung · English
The Subject of the Contract is the design, supply, installation, testing, commissioning, and handover of a grid-connected photovoltaic (PV) system at the Main Pumping Station of RWC Hidrodrini, on a turnkey basis.The scope of Works and Services, technical requirements, performance criteria, drawings, and all other obligations of the Contractor are fully defined in the Technical Specifications of the Tender Documents.
- Frist
- 23.10.2026 10:00 UTC+02:00
- Geschätzter Wert
- Nicht angegeben