Awarded TED · Source

Ireland · Architectural, construction, engineering and inspection services

Official title · English

Electrical Maintenance Framework (2025)

Dublin Bus / Bus Atha Cliath · Ireland

View notices under this name
Official summary

Dublin Bus is looking to establish a maintenance framework with an Electrical Contractor to carry out repair and maintenance of the electrical systems at each of its facilities which consists of All locations throughout Dublin City and County. Dublin Bus wishes to establish a contract, which will provide ongoing basic maintenance, repair and small new-works at all Dublin Bus locations as per Annex 1 below. There will be 2 lots relating to this tender.…

What is being procured?
Deadline Not announced
Estimated value2,000,000 EUR
PublishedOct 20, 2026
Open official notice ↗

Official summary

What is being procured?

Dublin Bus is looking to establish a maintenance framework with an Electrical Contractor to carry out repair and maintenance of the electrical systems at each of its facilities which consists of All locations throughout Dublin City and County. Dublin Bus wishes to establish a contract, which will provide ongoing basic maintenance, repair and small new-works at all Dublin Bus locations as per Annex 1 below. There will be 2 lots relating to this tender. Lot 1 will be electrical maintenance, repair and small new works (values greater than €10,000 ex VAT) at all facilities. This will be awarded to a Contractor following completion of the tender process. Lot 2 will relate to larger new-works installation (greater than €10,000 ex VAT).…

Notice history

Procurement timeline

Follow the main stages and updates linked to this procurement procedure.

No other related notice has been identified yet.

  1. Result notice Notice being viewed

    · TED 726032-2026

    Open official notice ↗

Data is restructured for easier reading. The official notice and procurement documents always prevail.

Source and reliability

TED · 726032-2026. Checked on Oct 20, 2026, 11:05 AM.

Data is restructured for easier reading. The official notice and procurement documents always prevail.

Report an error by email