Virallinen yhteenveto · English
Mitä hankitaan?
Dublin Bus is looking to establish a maintenance framework with an Electrical Contractor to carry out repair and maintenance of the electrical systems at each of its facilities which consists of All locations throughout Dublin City and County. Dublin Bus wishes to establish a contract, which will provide ongoing basic maintenance, repair and small new-works at all Dublin Bus locations as per Annex 1 below. There will be 2 lots relating to this tender. Lot 1 will be electrical maintenance, repair and small new works (values greater than €10,000 ex VAT) at all facilities. This will be awarded to a Contractor following completion of the tender process. Lot 2 will relate to larger new-works installation (greater than €10,000 ex VAT).…
Suuntaa antava konekäännös. Virallinen yhteenveto on edelleen ensisijainen.
Virallinen yhteenveto · English
Dublin Bus is looking to establish a maintenance framework with an Electrical Contractor to carry out repair and maintenance of the electrical systems at each of its facilities which consists of All locations throughout Dublin City and County. Dublin Bus wishes to establish a contract, which will provide ongoing basic maintenance, repair and small new-works at all Dublin Bus locations as per Annex 1 below. There will be 2 lots relating to this tender. Lot 1 will be electrical maintenance, repair and small new works (values greater than €10,000 ex VAT) at all facilities. This will be awarded to a Contractor following completion of the tender process. Lot 2 will relate to larger new-works installation (greater than €10,000 ex VAT).…
Ilmoitushistoria
Hankintamenettelyn aikajana
Seuraa tähän hankintamenettelyyn liittyviä päävaiheita ja päivityksiä.
Muita tähän liittyviä ilmoituksia ei ole vielä tunnistettu.
Tiedot on jäsennetty helpommin luettaviksi. Virallinen ilmoitus ja hankinta-asiakirjat ovat aina ratkaisevia.
Lähde ja luotettavuus
TED · 726032-2026. Tarkistettu 20.10.2026 klo 11.05.
Tiedot on jäsennetty helpommin luettaviksi. Virallinen ilmoitus ja hankinta-asiakirjat ovat aina ratkaisevia.