Open TED · Source

Poland · Construction structures, materials and auxiliary products

Official title · English

Fabrication of AP1000 Safety-Related Shield Building Steel and Concrete Composite (SC) Wall Panels (Commodity Code SC40) for Poland AP 1000® Project - Unit 2 & 3

Westinghouse Electric Poland Sp.z.o.o · Poland

View notices under this name
Official summary

The Shield Building is the structure and annulus area that surrounds the containment building and is located in the Nuclear Island (NI). The Shield Building uses concrete-filled steel plate construction (SC) as well as reinforced concrete sections. The SC40 Shield Building SC Wall Panels scope reflects the cylindrical portion of the concrete-filled steel plate construction for the Shield Building. The Shield Building cylindrical wall has an outside…

What is being procured?
Deadline Oct 12, 2026 23:59 UTC-05:00
Estimated valueNot announced
PublishedSep 22, 2026
View notice Analyse this notice with AI Summary, requirements and deadlines based on the information in this notice. The tender documents are not read.
Open documents and apply ↗
westinghousenuclear.com

The buyer’s platform may require registration. Submit your bid on that platform.

Official summary

What is being procured?

The Shield Building is the structure and annulus area that surrounds the containment building and is located in the Nuclear Island (NI). The Shield Building uses concrete-filled steel plate construction (SC) as well as reinforced concrete sections. The SC40 Shield Building SC Wall Panels scope reflects the cylindrical portion of the concrete-filled steel plate construction for the Shield Building. The Shield Building cylindrical wall has an outside radius of 22.1 m and a thickness of 0.91 m. For each one (1) unit, there are 167 individually fabricated/shipped SC40 panels. There are four main types of panels, which are further arranged into 56 unique panel “groups” that each represent a unique panel configuration. The panels are steel composite construction with 19.1 mm to 25.4 mm thick rol

Preparation checklist

Prepare my response

Checks to carry out in the official documents. This guide is not an automated document analysis.

  1. Read the complete documents and amendments
  2. Check participation conditions and required documents
  3. Check whether a site visit or meeting is required
  4. Review award criteria and their weighting
  5. Check available resources, budget and schedule
  6. Confirm the submission process and deadline

TED · 651178-2026. Checked on Sep 22, 2026, 7:05 AM.
https://ted.europa.eu/en/notice/-/detail/651178-2026

Sign in →
Analyse PDF tender documents

Notice and PDF analyses use the same allowance.

Notice history

Procurement timeline

Follow the main stages and updates linked to this procurement procedure.

  1. Competition notice

    · TED 284240-2026

    Open official notice ↗
  2. Competition notice

    · TED 284690-2026

    Open official notice ↗
  3. Competition notice

    · TED 284805-2026

    Open official notice ↗
  4. Competition notice

    · TED 285229-2026

    Open official notice ↗
  5. Competition notice

    · TED 287830-2026

    Open official notice ↗
  6. Competition notice

    · TED 287927-2026

    Open official notice ↗
  7. Competition notice

    · TED 287963-2026

    Open official notice ↗
  8. Correction notice

    · TED 398007-2026

    Open official notice ↗
  9. Correction notice

    · TED 519784-2026

    Open official notice ↗
  10. Competition notice Current notice

    · TED 651178-2026

    Open official notice ↗
  11. Competition notice

    · TED 652770-2026

    Open official notice ↗

Data is restructured for easier reading. The official notice and procurement documents always prevail.

Source and reliability

TED · 651178-2026. Checked on Sep 22, 2026, 7:05 AM.

Data is restructured for easier reading. The official notice and procurement documents always prevail.

Report an error by email